< Previous30 SPECIAL FOCUS oilandgasmiddleeast.com OCTOBER 2020 part of the NFE expansion is likely to come online in that time horizon, S&P Global Platts Analytics expects the overall commissioning of the new facilities to mimic Qatar’s last major expansion between 2009 and 2010, implying all four NFE trains will not be simultaneously online before 2027. While QP has consistently reaffirmed its determination to build an incremental six – not four – trains, the additional two NFS mega-trains are not included in the ongoing EPC process. Platts Analytics continues to view this expansionary phase as likely, but not within the current medium-term outlook, instead making commercial progress no earlier than 2028, after which Platts Analytics research shows the global LNG supply- demand balance will incentivize incremental capacity buildout—of which Qatar is arguably the most competitive. QP still faces the challenge of marketing this massive incremental volume. Unlike previous expansions, Qatar is moving forward without having NFE’s capacity underpinned by new long-term contracts, very similar to how it is proceeding with Golden Pass in the US. To be sure, this is not a trend isolated to QP. The precedent was set with LNG Canada in 2018, and more recently, in Senegal and Mauritania, where all the 2.5 million mt/year offtake from Greater Tortue LNG is destined for BP Trading’s portfolio. For Qatar, though, the task is mammoth, with QP facing over 50 million mt/year of uncontracted supply in the next six years, 31.2 million mt/year of new uncontracted capacity (not counting the 11 million mt/year of equity production from Golden Pass) and 23 million mt/ year of expiring contracts, 60% of which are with Qatar’s traditional Asian customer base. With the global LNG market seeing just 15 million mt/year of new end-user backed contracts signed in all of 2019, the challenge Qatar faces is mammoth even for LNG’s most powerful player. Much of the difficulty QP will face comes from Qatar’s comfort, and in some sense, dependence on long-term oil indexation. QP’s new volumes will need to be marketed against a growing field of portfolio supply, much of which will clear the market around spot LNG prices, best represented by the Platts JKM, which S&P Global Platts Analytics does not see breaching the $7/MMBtu mark (annualized, real 2019 USD) before the end of the decade. This sits well below the average price of $9/MMBtu QP has realized for its sales into Northeast Asia since 2016. Consequently, Qatar must now prepare itself for sales prices below what it is used to achieving, potentially 31 SPECIAL FOCUS oilandgasmiddleeast.com OCTOBER 2020 highlighting the need for such a large capacity buildout. Given the scale of the uncontracted capacity, Qatar will look to its yet-to-be identified project partners to market or, in the best case, consume some of this incremental output. This highlights the strong potential that QP will seek out an Asian regional energy player or end-user as a cornerstone partner, a strategy which could simultaneously deepen geo-economic ties with China. That said, Qatar is hedging its bets, expanding its European “put option” through the purchase of 100% of Zeebrugge’s regasification capacity and standing up its own in-house trading division, which will allow it to lean more heavily on active spot sales and optimization. Even with these efforts, increased contract flexibility will be essential if QP is to bring its proposed capacity into service with substantial long-term contractual coverage. 32 PROJECT FOCUS oilandgasmiddleeast.com OCTOBER 2020 The Non-associated gas (NAG) Long-Term Field Development (LTFD) project is a continuation of Tatweer’s commitment to secure the delivery of natural gas needed to meet the growing demand power demands of the Kingdom of Bahrain. Phase 2 of the project will build 2 new gas processing trains as well as additional wells and infrastructure to deliver the gas to the processing facilities BACKGROUND Name of Client Tatweer Petroleum Estimated Budget ($ US) 110,000,000 Facility Type Gas Processing Sector Gas Status Engineering & Procurement Location Awali Project Start Q2-2018 End Date Q4-2021 Last Updated 14-09-2020 Main Contractor Petrofac Contract Value ($ US) 49,300,000 Award Date Q2-2020 FAST FACTS PROJECT SCOPE The central scope of the project is building two 500 Million Standard Cubic Feet/Day (MMSCFD) gas dehydration unit (GDU) trains (Train 2 & 3) with associated gas dehydration facilities and non-associated gas compression facilities (NCF) at the central gas dehydration facilities plot. Other parts of the scope will include: • Gas wells • Pipelines • Gas well hookups • Associated infrastructure. • Tie-ins for several new gas wells. Tatweer - NAG Long Term Field Development (LTFD) - Phase 2 RELATED PROJECTS Tatweer - NAG Long Term Field Development (LTFD) - Overview Tatweer - NAG Long Term Field Development (LTFD) - Phase 133 PROJECT FOCUS oilandgasmiddleeast.com OCTOBER 2020 PROJECT STATUS PROJECT FINANCE Tatweer Petroleum is the client. Stakeholders in Tatweer: • Mubadala Petroleum, a subsidiary of Abu Dhabi investment vehicle Mubadala Development Company, has a 25% stake. • US-based Occidental Petroleum has a 25% stake. • Nogaholding owns the remaining 50%. DateStatus Jan 2020 Tatweer has received bids for the EPC contract on the Non-Associated Gas Compression Facilities (NCF). The companies that submitted bids are: • TDE Overseas Ltd. • Enerserv • Exterran Bahrain • Woodlands Energy Services • Enerfl ex Middle East Jan 2020Tatweer is expected to award the EPC contract for the 24 Pre-Unayzah gas well hookups, associated pipelines, and tie-ins at the GDUs in Q2 2020. Nov 2019 Tatweer has stated that they expect to sign the EPC contract to connect 24 Pre-Unayzah gas well hookups, associated pipelines, and tie-ins at the GDUs, with Petrofac in Q4 2019 or Q1 2020. Nov 2019 Tatweer has received bids for the EPC contract to connect 24 Pre-Unayzah gas well hookups, associated pipelines, and tie-ins at the GDUs. The bids were: • Petrofac International: $49 million • Worley: $76 million • TDE Overseas: $99 million Jul 2019Bidding contractors have stated that Tatweer is still in the process of evaluating the bids and has not yet released a plan for when they will award the contract. Feb 2019Tatweer is evaluating tenders for two gas dehydration unit trains. The contract will be awarded in Q2 2019. Dec 2018 The bids submitted for the EPC contract are as follows: • PEG Engineering & Contracting (DMCC)- $185m • Petrofac International SPC- $195m • JGC Gulf International- $294m • CB&I- $295m • TDE Overseas- $232m (this bid has been suspended) Oct 2018Tatweer has set 14 November 2018 as the deadline for companies to submit bids for the EPC contract for the two 500 MMSCFD GDU trains. Aug 2018 Aft er the completion of the centralized gas dehydration project for Tatweer, Petrofac is awarded a contract to build additional gas wells and pipelines which will be used to connect the new wells to the current and future processing facilities. Jul 2018Tatweer has released a tender for the EPC contract for the two 500 MMSCFD Gas Dehydration Unit (GDU) trains. Project Announced2Q-2018 EPC ITB3Q-2018 Engineering & Procurement 2Q-2020 Construction4Q-2020 Completed 4Q-2021 PROJECT SCHEDULES CONTRACTORS Contract TypePre-QualifiedBiddersAwarded EPC • Petrofac • PEG Engineering & Contracting DMCC • JGC Gulf Interna- tional Company • CB&I - Chicago Bridge & Iron Company • TDE • Worley • Enerflex • Enerserv • Exterran Holdings Inc • Petrofac • TDE • Worley • Enerflex • Enerserv • Exterran Hold- ings Inc • Petrofac Sub-Contractors--• PetrofacPROJECTS oilandgasmiddleeast.com OCTOBER 2020 34 Ongoing and upcoming projects Information is supplied by DMS Projects GCC GAS – SEPTEMBER 2020 ProjectCountryCitySectorFacilityBudgetAward DateStatus Completion Date AD Ports - ACT - Khalifa Port Liquid Storage Facility - Phase 1U.A.E.Abu DhabiGasGas Storage Tanks400,000,0002020-Q4FEED2022-Q2 ADNOC - Dusup - Jebel Ali Gas ReservoirU.A.E.Jebel AliGasGas Production2021-Q3Pre-FEED2025-Q4 ADNOC Gas Processing - Bab Sour Gas Field DevelopmentU.A.E.Abu DhabiGasGas Processing10,000,000,0002022-Q1On Hold2024-Q4 ADNOC Gas Processing - Bu Hasa Debottlenecking & Associated Pipeline U.A.E.Bu HasaGasGas Production300,000,0002019-Q3Construction2021-Q2 ADNOC Gas Processing - Habshan 4 CO2 Recovery & InjectionU.A.E.Abu DhabiGasCarbon Dioxide80,000,0002021-Q1On Hold2023-Q4 ADNOC Gas Processing - Habshan 5 - New Compression FacilityU.A.E.HabshanGasGas Compression800,000,0002020-Q3On Hold2023-Q4 ADNOC Gas Processing - Habshan 5 Debottlenecking for Associated Gas U.A.E.HabshanGasGas Production250,000,0002020-Q1 Engineering & Procurement 2021-Q2 ADNOC Gas Processing - Ruwais Capacity Enhancement - NGL Trains 1,2,3 & 4 U.A.E.RuwaisGas Natural Gas Liquefaction (NGL) 300,000,0002020-Q3EPC ITB2022-Q4 ADNOC Gas Processing - Ruwais Train 1 & 2 Process Cooling Fire Water Pumps Replacement U.A.E.RuwaisGasGas Processing80,000,0002018-Q2Construction2020-Q4 ADNOC Gas Processing - Thammama F Early Nitrogen Rejection UnitU.A.E.Abu DhabiGasGas Processing500,000,0002020-Q4On Hold2025-Q4 ADNOC LNG - Integrated Gas Development (IGD) - Expansion (Phase 2)U.A.E.Das IslandGas, PipelineGas Field Development450,000,0002018-Q3Construction2022-Q1 ADNOC LNG - Integrated Gas Development (IGD) - Expansion - Overview U.A.E.Das IslandGasGas Field Development1,370,000,0002015-Q1Construction2022-Q1 ADNOC Offshore - Nitrogen Plant UpgradeU.A.E.Abu DhabiGasNitrogen55,000,0002022-Q4On Hold2025-Q4 ADNOC Offshore - Satah Al Razboot (SARB) Deep Gas DevelopmentU.A.E.Satah FieldGas, OffshoreOffshore Platform1,000,000,0002021-Q3Feasibility Study2023-Q4 ADNOC Offshore - Umm Shaif Gas Cap Condensate DevelopmentU.A.E.Abu DhabiGas, PipelineGas Processing1,500,000,0002020-Q4EPC ITB2024-Q3 ADNOC Onshore - Bab Field SIMGAP EOR ProjectU.A.E.BabOil, Gas Enhanced Oil Recovery (EOR) 100,000,0002020-Q4Design2023-Q3 ADNOC Onshore - Bab Gas Compression - Phase 3U.A.E.Abu DhabiGasGas Compression220,000,0002020-Q4EPC ITB2022-Q4 ADNOC Onshore - Bab TH - F Peripheral DevelopmentU.A.E.Abu DhabiOil, GasNitrogen400,000,0002020-Q4On Hold2022-Q2 ADNOC Onshore - North East Bab (NEB) Al Dabb'iya ASR Gas Development U.A.E.Abu DhabiGasGas Processing350,000,0002021-Q2On Hold2023-Q4 ADNOC Sour Gas - Dalma Field Development - Onshore PackageU.A.E.DalmaOil, GasOil Field Development1,100,000,0002020-Q4EPC ITB2023-Q1 Al-Khafji Joint Operations (KJO) - Dorra Gas Field Development - Overview Saudi ArabiaEastern RegionGasGas Field Development3,000,000,000Feasibility Study Aramco - Hawiyah Unayzah Gas Storage PipelineSaudi ArabiaHawiyahGasGas Pipeline300,000,000EPC ITB2024-Q1 Aramco - Ras Tanura Refinery - Sulphur Recovery Units UpgradeSaudi ArabiaRas TanuraGasSulphur Recovery200,000,000FEED BAPCO - Offshore Blocks 1,2,3,4 Exploration and ProductionBahrainVariousOil, Gas, OffshoreOil & Gas Field80,000,0002018-Q2 Engineering & Procurement 2022-Q1 BP - Block 61 - Ghazeer Field DevelopmentOmanAl DahirahGasGas Field Development5,000,000,0002017-Q4Commissioning2020-Q3 BP - Block 61 - Khazzan and Ghazeer Gas Fields Development - Overview OmanAl DahirahGasGas Field Development24,000,000,0002014-Q1Commissioning2020-Q3 Dolphin Energy - Northern Emirate Pipeline (NEP)U.A.E.SharjahGas, PipelineGas Pipeline150,000,0002021-Q4On Hold2024-Q3 Emirates LNG - Fujairah LNG TerminalU.A.E.FujairahGasLNG Regassification3,000,000,0002020-Q4On Hold2024-Q4 GTI Fujairah FZC - Fujairah Oil Storage Terminal - Phase 3U.A.E.FujairahOil, GasOil Storage Tanks100,000,0002020-Q4On Hold2023-Q435 PROJECTS oilandgasmiddleeast.com OCTOBER 2020 ProjectCountryCitySectorFacilityBudgetAward DateStatus Completion Date KGOC - Al Khafji Gas and Condensate Export PipelineKuwaitAl-KhafjiGas, PipelineGas Pipeline2,100,000,0002012-Q1Construction2020-Q4 KGOC - Wafra Main Gathering CenterKuwaitWafraGasGas Gathering Centre200,000,0002013-Q1On Hold2021-Q1 KIPIC - Al Zour LNG Import And Regasification TerminalKuwaitAl ZourGas Liquefied Natural Gas (LNG) 3,330,000,0002016-Q1Construction2021-Q1 KNPC - Mina Al Ahmadi Refinery Fifth Gas TrainKuwaitMina Al AhmadiGasGas Processing1,500,000,0002015-Q2Construction2021-Q1 KOC - Jurassic Production Facilities (JPF-4 & JPF-5) Off-Plot WorksKuwait Northern Kuwait GasGas Production115,000,0002020-Q4EPC ITB2025-Q1 KOC - Jurassic Production Facility (JPF) - JPF-4 and JPF-5Kuwait Northern Kuwait Oil, GasOil & Gas Field700,000,0002020-Q4EPC ITB2021-Q2 KOC - New Strategic Gas Export Pipeline From North Kuwait To Mina Al-Ahmadi Refinery Kuwait Northern Kuwait Gas, PipelineGas Pipeline480,000,0002019-Q1 Engineering & Procurement 2021-Q1 KOC - North Kuwait Gathering Center (GC) 32Kuwait Northern Kuwait GasGas Gathering Centre1,650,000,0002017-Q1Construction2021-Q1 KOC - North Kuwait Manifold Gathering System for Gathering Centers (GC) 29, 30, 31 Kuwait Northern Kuwait GasGas Gathering Centre2,500,000,0002014-Q3Construction2020-Q4 KOC - Southeast Kuwait BS-140 & BS-150 UpgradeKuwait Southeast Kuwait GasGas Processing300,000,000FEED2023-Q1 KOC - Southeast Kuwait BS-160 UpgradeKuwait Southeast Kuwait GasGas Processing270,000,0002020-Q4FEED2021-Q1 KOC - Water Management Project - Gathering Centers 3, 4, 7, 21KuwaitSouth KuwaitGasGas Gathering Centre245,000,0002017-Q1Construction2020-Q3 KOC - Water Management Project - Gathering Centers 6, 8, 11, 19Kuwait Southeast Kuwait GasGas Gathering Centre240,000,0002017-Q1Construction2020-Q3 KOC - Water Management Project - Gathering Centers 9, 10, 20, 22KuwaitEast KuwaitGasGas Gathering Centre196,000,0002017-Q1Construction2020-Q3 KOC - Water Management Project - OverviewKuwaitVariousGasGas Gathering Centre681,000,0002017-Q1Construction2020-Q3 KOC - West Kuwait BS-171 Gas Sweetening FacilityKuwaitWest KuwaitGasGas Processing300,000,0002020-Q4FEED2023-Q1 Marsa LNG - Sohar LNG Bunkering Terminal (SLNGB)OmanSoharGas Liquefied Natural Gas (LNG) 200,000,0002020-Q4EPC ITB2023-Q4 Ministry of Oil & Gas - Iran to Oman Subsea Natural Gas PipelineOmanSoharGas, PipelineGas600,000,0002020-Q3EPC ITB2023-Q3 MISA - Unibio - Edhafat - BioProtein FacilitySaudi ArabiaVariousGasGas Processing200,000,0002020-Q1Project Announced2021-Q4 MOG - Block 43b Onshore Exploration and ProductionOmanNorthern OmanOil, GasGas Exploration40,000,0002020-Q1On Hold2023-Q3 NIGC - Jubail GAS Phase 9Saudi ArabiaJubailGas, IndustrialIndustrial Gas Production900,000,0002018-Q3Construction2020-Q3 Oman Gas Company - South Grid Debottlenecking - Phase 2OmanVariousGas, PipelineGas80,000,0002020-Q3EPC ITB2023-Q3 Oman Gas Company - Muscat Gas NetworkOmanMuscatGasGas Network100,000,0002020-Q4On Hold2025-Q4 Oman LNG - LNG Plant UpgradeOmanQalhatGas Liquefied Natural Gas (LNG) 100,000,0002020-Q1 Engineering & Procurement 2022-Q4 OQ - Liwa Plastics Industries Complex - NGL Extraction UnitsOmanSoharGas Natural Gas Liquefaction (NGL) 700,000,0002015-Q4Construction2020-Q3 OQ - Liwa Plastics Industries Complex - NGL PipelineOmanSoharGas, PipelineGas400,000,0002016-Q1Commissioning2020-Q4 OQ - Salalah LPG ExtractionOmanSalalahGas Liquefied Petroleum Gas (LPG) 650,000,0002017-Q1Construction2020-Q3 PDO - Flare Gas to Power SchemesOmanVariousGasGas Recycling200,000,0002020-Q2FEED2022-Q2 PDO - Mabrouk North East Deep Gas Field DevelopmentOmanSaih RawlGasGas Field Development5,000,000,0002020-Q1 Engineering & Procurement 2023-Q1 PDO - Marmul Main Production Station (MMPS) - Gas CompressionOmanMarmulGasGas Compression150,000,0002020-Q4FEED2023-Q3 PDO - Yibal RejuvenationOmanYibalOil, GasOil Field Development500,000,0002017-Q2Construction2021-Q3 Port of Duqm - Floating Storage Regasification Unit (FSRU)OmanDuqmGasLNG Regassification500,000,0002021-Q1On Hold2024-Q136 PROJECTS oilandgasmiddleeast.com OCTOBER 2020 RAK Gas - LPG Storage Terminal - OverviewU.A.E.Ras Al KhaimahGas Liquefied Petroleum Gas (LPG) 300,000,0002020-Q2EPC ITB2022-Q1 SAMREF - Hydrogen Addition Residue Project (SHARP)Saudi ArabiaYanbuGasHydrogenFEED2021-Q1 Saudi Aramco - Yanbu to North Jeddah NGL PipelineSaudi ArabiaYanbuGas, PipelineGas Pipeline600,000,0002016-Q3Construction2021-Q4 Saudi Aramco - Fadhili Gas Plant - Downstream PackagesSaudi ArabiaEastern RegionGasGas Processing650,000,0002016-Q3Construction2020-Q3 Saudi Aramco - Fadhili Gas Plant - OverviewSaudi ArabiaEastern RegionGasGas Treatment Plant6,600,000,0002015-Q3Construction2021-Q1 Saudi Aramco - Gas Storage FacilitiesSaudi ArabiaVariousGasGas Storage Tanks1,000,000,000Project Announced2025-Q4 Saudi Aramco - Haradh Gas Increment Program - Freeflow PipelinesSaudi ArabiaHaradhGas, PipelineFlowlines470,000,0002017-Q4Construction2021-Q3 Saudi Aramco - Haradh Gas Increment Program - North Haradh Field Gas Compression Facilities Saudi ArabiaHaradhGasGas Compression1,200,000,0002017-Q4Construction2021-Q3 Saudi Aramco - Haradh Gas Increment Program - South Haradh Field Gas Compression Facilities Saudi ArabiaHaradhGasGas Compression1,200,000,0002017-Q4Construction2020-Q4 Saudi Aramco - Haradh Gas Increment Program - OverviewSaudi ArabiaHaradhGas, PipelineGas Compression1,200,000,0002017-Q4Construction2021-Q4 Saudi Aramco - Haradh Gas Increment Program - Satellite Gas Compression Facilities Saudi ArabiaHaradhGasGas Compression1,200,000,0002017-Q4Construction2021-Q3 Saudi Aramco - Hawiyah Gas Plant ExpansionSaudi ArabiaHawiyahGasGas Processing1,200,000,0002017-Q4Construction2021-Q2 Saudi Aramco - Hawiyah Unayzah Gas Reservoir StorageSaudi ArabiaHawiyahGasGas Storage Tanks1,700,000,0002020-Q1 Engineering & Procurement 2023-Q4 Saudi Aramco - Juaymah Enhanced LPG Piping NetworkSaudi ArabiaJuaymahGas, PipelineGas100,000,0002019-Q4 Engineering & Procurement 2020-Q4 Saudi Aramco - Liquefied Natural Gas (LNG) Receiving TerminalSaudi ArabiaJeddahGas Liquefied Natural Gas (LNG) 200,000,000Feasibility Study2023-Q1 Saudi Aramco - Marjan Field Expansion - Interlinked Pipeline Installation Saudi ArabiaMarjanOil, Gas, PipelinePipeline600,000,0002019-Q3Construction2022-Q1 Saudi Aramco - Marjan Field Expansion - OverviewSaudi ArabiaMarjanOil, GasOil & Gas Field16,000,000,0002018-Q2Construction2026-Q2 Saudi Aramco - Marjan Field Expansion - Package 10 - Gas Treatment and Sulphur Recovery Facilities Saudi ArabiaMarjanGasGas Treatment Plant1,200,000,0002019-Q2 Engineering & Procurement 2022-Q2 Saudi Aramco - Marjan Field Expansion - Package 11 - Natural Gas-to- Liquids (NGL) Recovery and Fractionation Facilities Saudi ArabiaMarjanGas Natural Gas Liquefaction (NGL) 1,000,000,0002019-Q2 Engineering & Procurement 2022-Q2 Saudi Aramco - Marjan Field Expansion - Package 14 - Sulphur Handling and Propane Loading Facilities Saudi ArabiaMarjanGasSulphur Recovery100,000,0002019-Q4 Engineering & Procurement 2022-Q2 Saudi Aramco - Marjan Field Expansion - Package 4 - Offshore Gas Facilities and Pipelines Saudi ArabiaMarjanGas, OffshoreGas Field Development1,500,000,0002019-Q1Construction2022-Q4 Saudi Aramco - Marjan Field Expansion - Package 6 - Tanajib Onshore Oil Facilities Saudi ArabiaMarjanOil, GasGas Compression1,500,000,0002019-Q2Construction2023-Q4 Saudi Aramco - Marjan Field Expansion - Package 9 - Inlet Storage and Compression Facilities Saudi ArabiaMarjanGasGas Compression1,000,000,0002019-Q2 Engineering & Procurement 2022-Q2 Saudi Aramco - Marjan, Berri, Zuluf and Safaniyah Expansion - Overview Saudi ArabiaEastern RegionOil, Gas, OffshoreOil & Gas Field7,000,000,0002016-Q4Construction2023-Q2 Saudi Aramco - Master Gas System Expansion (MGSE) - OverviewSaudi ArabiaVariousGas, PipelineNon Associated Gas4,050,000,0002014-Q3Construction2020-Q4 Saudi Aramco - Master Gas System Expansion (MGSE) - Phase 2 - Package 1 - Western Region Pipeline Saudi ArabiaWestern RegionGas, PipelineGas830,000,0002016-Q1Construction2020-Q4 Saudi Aramco - Master Gas System Expansion (MGSE) - Phase 2 - Package 2 - Central Region Pipeline Saudi ArabiaCentral RegionGas, PipelineGas367,000,0002016-Q1Construction2020-Q4 Saudi Aramco - Master Gas System Expansion (MGSE) - Phase 2 - Package 3 - Eastern Region Pipeline Saudi ArabiaEastern RegionGas, PipelineGas374,000,0002016-Q1Construction2020-Q4 Saudi Aramco - Multiple Pipelines RevampSaudi ArabiaEastern RegionGas, PipelineGas250,000,0002016-Q4Construction2020-Q4 Saudi Aramco - Storage TanksSaudi ArabiaVarious Oil, Gas, Infrastructure Bulk Storage250,000,0002020-Q2 Engineering & Procurement 2022-Q4 Saudi Aramco - Storage Tanks and Associated EquipmentSaudi ArabiaYanbuGasGas Storage Tanks400,000,0002017-Q1Construction2020-Q4 ProjectCountryCitySectorFacilityBudgetAward DateStatus Completion Date37 PROJECTS oilandgasmiddleeast.com OCTOBER 2020 Saudi Aramco - Unconventional Gas Program - (Program)Saudi ArabiaVariousGasGas Field Development7,000,000,0002020-Q1EPC ITB2022-Q4 Saudi Aramco - Unconventional Gas Program - Jafurah Gas Plant - Compression Facilities Package Saudi ArabiaAl JafurahGasGas Compression1,500,000,0002020-Q3EPC ITB2024-Q4 Saudi Aramco - Unconventional Gas Program - Jafurah Gas Plant - Export Pipelines Saudi ArabiaAl JafurahGasGas Pipeline500,000,000EPC ITB2024-Q4 Saudi Aramco - Unconventional Gas Program - Jafurah Gas Plant - Gas Processing Facility Package Saudi ArabiaAl JafurahGasGas Processing500,000,0002020-Q1 Engineering & Procurement 2023-Q1 Saudi Aramco - Unconventional Gas Program - Jafurah Gas Plant - Overview Saudi ArabiaAl JafurahGasGas Processing2,500,000,0002020-Q1 Engineering & Procurement 2024-Q4 Saudi Aramco - Unconventional Gas Program - Jafurah Gas Plant - Pipeline and Well Tie-ins Saudi ArabiaAl JafurahGas, PipelineGas Pipeline500,000,0002020-Q3EPC ITB2023-Q1 Saudi Aramco - Unconventional Gas Program - Jafurah Gas Plant - Storage and Loading Facilities Saudi ArabiaAl JafurahGasGas Storage Tanks100,000,000FEED2024-Q4 Saudi Aramco - Unconventional Gas Program - Jafurah Gas Plant - Utilities Package Saudi ArabiaAl JafurahGas, IndustrialOffsites & Utilities500,000,0002020-Q3EPC ITB2023-Q1 Saudi Aramco - Unconventional Gas Program - South Ghawar Development - Gas Separation Plant Saudi ArabiaSouth GhawarGasGas Treatment Plant700,000,0002020-Q1 Engineering & Procurement 2021-Q4 Saudi Aramco - Unconventional Gas Program - South Ghawar Field Development - Overview Saudi ArabiaSouth GhawarGasGas Field Development2,200,000,0002020-Q1 Engineering & Procurement 2022-Q4 Saudi Aramco - Unconventional Gas Program - South Ghawar Field Development - Pipeline Transmission Installation Saudi ArabiaSouth GhawarGas, PipelineGas Pipeline500,000,0002020-Q2 Engineering & Procurement 2022-Q4 Saudi Aramco - Unconventional Gas Program - South Ghawar Field Development - Tie-in Installation Saudi ArabiaSouth GhawarGasGas Field Development500,000,0002020-Q1 Engineering & Procurement 2022-Q4 Saudi Aramco - Unconventional Gas Program - Tight Gas Production Systems A and B - Overview Saudi ArabiaTuraifGasGas Field Development3,500,000,0002015-Q3Construction2020-Q4 Saudi Aramco - Unconventional Gas Program - Tight Gas Production Systems B Saudi ArabiaTuraifGasGas Field Development1,000,000,0002016-Q1Construction2020-Q4 Saudi Aramco - Uthmaniya & Shedgum New Compression PlantsSaudi ArabiaUthmaniyahGasGas Compression2,500,000,0002020-Q2EPC ITB2021-Q1 SNOC - Sharjah LNG Import TerminalU.A.E.SharjahGas Floating Storage Regasification Unit (FSRU) 800,000,0002020-Q3On Hold2023-Q1 Tatweer - NAG Long Term Field Development (LTFD) - OverviewBahrainAwaliGasGas Field Development150,000,0002015-Q3Construction2021-Q4 Tatweer - NAG Long Term Field Development (LTFD) - Phase 2BahrainAwaliGasGas Processing110,000,0002020-Q2 Engineering & Procurement 2021-Q4 Total - Diyab Gas Export Pilot Project (Unconventional Gas)U.A.E.RuwaisGasGas Exploration1,000,000,0002018-Q4Construction2025-Q1 Saudi Aramco - Marjan, Berri, Zuluf and Safaniyah Expansion - Overview Saudi ArabiaEastern RegionOil, Gas, OffshoreOil & Gas Field7,000,000,0002016-Q4Construction2023-Q2 Saudi Aramco - Master Gas System Expansion (MGSE) - OverviewSaudi ArabiaVariousGas, PipelineNon Associated Gas4,050,000,0002014-Q3Construction2020-Q4 Saudi Aramco - Master Gas System Expansion (MGSE) - Phase 2 - Package 1 - Western Region Pipeline Saudi ArabiaWestern RegionGas, PipelineGas830,000,0002016-Q1Construction2020-Q4 Saudi Aramco - Master Gas System Expansion (MGSE) - Phase 2 - Package 2 - Central Region Pipeline Saudi ArabiaCentral RegionGas, PipelineGas367,000,0002016-Q1Construction2020-Q4 Saudi Aramco - Master Gas System Expansion (MGSE) - Phase 2 - Package 3 - Eastern Region Pipeline Saudi ArabiaEastern RegionGas, PipelineGas374,000,0002016-Q1Construction2020-Q4 Saudi Aramco - Multiple Pipelines RevampSaudi ArabiaEastern RegionGas, PipelineGas250,000,0002016-Q4Construction2020-Q4 Saudi Aramco - Storage TanksSaudi ArabiaVarious Oil, Gas, Infrastructure Bulk Storage250,000,0002020-Q2 Engineering & Procurement 2022-Q4 Saudi Aramco - Storage Tanks and Associated EquipmentSaudi ArabiaYanbuGasGas Storage Tanks400,000,0002017-Q1Construction2020-Q4 Saudi Aramco - Unconventional Gas Program - (Program)Saudi ArabiaVariousGasGas Field Development7,000,000,0002020-Q1EPC ITB2022-Q4 Saudi Aramco - Unconventional Gas Program - Jafurah Gas Plant - Compression Facilities Package Saudi ArabiaAl JafurahGasGas Compression1,500,000,0002020-Q2EPC ITB2023-Q1 Saudi Aramco - Unconventional Gas Program - Jafurah Gas Plant - Gas Processing Facility Package Saudi ArabiaAl JafurahGasGas Processing500,000,0002020-Q1 Engineering & Procurement 2023-Q1 Saudi Aramco - Unconventional Gas Program - Jafurah Gas Plant - Overview Saudi ArabiaAl JafurahGasGas Processing2,500,000,0002020-Q1 Engineering & Procurement 2023-Q1 ProjectCountryCitySectorFacilityBudgetAward DateStatus Completion Date38 PROJECTS oilandgasmiddleeast.com OCTOBER 2020 GCC OIL – SEPTEMBER 2020 ProjectCountryCitySectorFacilityBudget Award Date Status Completion Date ADNOC - EMARAT - Fujairah Terminal Expansion Phase 3U.A.E.FujairahOilOil Storage Terminal40,000,0002021-Q1On Hold2024-Q4 ADNOC - Al Dhafra Petroleum - Haliba Oil Field - OverviewU.A.E.HalibaOilOil Field Development1,350,000,0002018-Q1Construction2023-Q4 ADNOC - Al Dhafra Petroleum - Haliba Oil Field - Phase 1U.A.E.HalibaOilOil Field Development500,000,0002018-Q1Commissioning2020-Q4 ADNOC - Al Dhafra Petroleum - Haliba Oil Field - Phase 2U.A.E.HalibaOilOil Field Development800,000,0002020-Q4FEED2023-Q4 ADNOC - Al Dhafra Petroleum - Haliba Tie - in WellsU.A.E.HalibaOilOil Field Development130,000,0002020-Q2 Engineering & Procurement 2024-Q2 ADNOC - Fujairah - Midstream/ Downstream FacilityU.A.E.FujairahOilOil & Gas Field2021-Q4Project Announced2025-Q4 ADNOC - Fujairah Mandous FieldU.A.E.MandousOilOil Storage Tanks2,200,000,0002017-Q4Construction2023-Q4 ADNOC - Umm Shaif Long Term Development - Phase 1U.A.E.Umm ShaifOil, OffshoreOil Field Development400,000,0002020-Q4EPC ITB2023-Q1 ADNOC Offshore - Umm Al Dalkh Field DevelopmentU.A.E.Abu DhabiOilOil Field Development100,000,0002020-Q4EPC ITB2022-Q4 ADNOC Offshore - Umm Shaif & Zakum - Application of DOF on Brownfield Towers U.A.E.Abu DhabiOil, OffshoreOil Field Development120,000,0002020-Q1 Engineering & Procurement 2023-Q2 ADNOC Offshore - Umm Shaif Infield Pipelines ReplacementU.A.E.Abu DhabiOil, PipelineOil Field Development500,000,0002020-Q4On Hold2021-Q4 ADNOC Offshore - Zirku Facilities Capacity EnhancementU.A.E.ZirkuOilOil Field Development410,000,0002018-Q1Construction2021-Q2 ADNOC Onshore - 1.8MBPD Development - Bab Artificial Lift WellsU.A.E.Abu DhabiOilArtificial Lift100,000,0002020-Q2EPC ITB2021-Q3 ADNOC Onshore - Al Dabb'iya Thamama B Transition Zone B - Phase 2U.A.E.ThamamaOilOil Field Development200,000,0002020-Q4EPC ITB2023-Q4 ADNOC Onshore - Asab Full Field Development II - OverviewU.A.E.AsabOilOil Field Development250,000,0002019-Q1Construction2022-Q1 ADNOC Onshore - Asab Full Field Development II - Stage 1U.A.E.AsabOilOil Field Development100,000,0002019-Q1Construction2021-Q4 ADNOC Onshore - Asab Full Field Development II - Stage 2U.A.E.AsabOilOil Field Development150,000,0002020-Q4EPC ITB2022-Q4 ADNOC Onshore - Bab 485 MBD Sustainable FacilitiesU.A.E.BabOilArtificial Lift500,000,0002019-Q4 Engineering & Procurement 2021-Q2 ADNOC Onshore - Bab Field SIMGAP EOR ProjectU.A.E.BabOil, Gas Enhanced Oil Recovery (EOR) 100,000,0002020-Q4Design2023-Q3 ADNOC Onshore - Bab Integrated Facilities ProjectU.A.E.BabOilOil Field Development3,000,000,0002017-Q4Commissioning2020-Q4 ADNOC Onshore - Bab Process Control and Power System UpgradeU.A.E.BabOilWater Injection300,000,0002019-Q1Construction2021-Q3 ADNOC Onshore - Bab TH - F Peripheral DevelopmentU.A.E.Abu DhabiOil, GasNitrogen400,000,0002020-Q4On Hold2022-Q2 ADNOC Onshore - Bu Hasa Tie - in Wells (Call-Off)U.A.E.Bu HasaOilOil Field Development200,000,0002020-Q4EPC ITB2025-Q1 ADNOC Onshore - Buhasa Integrated Facilities ProjectU.A.E.Bu HasaOilOil Production3,000,000,0002018-Q4Construction2024-Q1 ADNOC Onshore - Buhasa Wellhead Remote MonitoringU.A.E.Abu DhabiOilOil Field Development100,000,0002019-Q1Construction2022-Q1 ADNOC Onshore - Fujairah MOT - Hydraulic Pressure Recovery System Turbine U.A.E.FujairahOilOil Field Development800,000,0002020-Q4On Hold2023-Q1 ADNOC Onshore - Jebel Dhanna Replacement of Main Oil Lines (MOL) 1.2 & 3.5 U.A.E.Jebel DhannaOilPipeline225,000,0002020-Q3 Engineering & Procurement 2023-Q1 ADNOC Onshore - Qusahwira Field Development - Phase 2U.A.E.Abu DhabiOilOil Field Development600,000,0002019-Q2Construction2023-Q3 ADNOC Onshore - Replacement of Flowlines & Wellheads Installation - Overview U.A.E.Abu DhabiOil, PipelineOil & Gas Field1,500,000,0002020-Q1On Hold2024-Q1 ADNOC Onshore - Replacement of Flowlines & Wellheads Installation - Package 1 U.A.E.Abu DhabiOil, PipelineOil & Gas Field300,000,0002020-Q1On Hold2024-Q1 ADNOC Onshore - Replacement of Flowlines & Wellheads Installation - Package 2 U.A.E.Abu DhabiOil, PipelineOil & Gas Field400,000,0002020-Q1On Hold2024-Q1 ADNOC Onshore - Replacement of Flowlines & Wellheads Installation - Package 3 U.A.E.Abu DhabiOil, PipelineOil & Gas Field300,000,0002020-Q1On Hold2024-Q1 ADNOC Onshore - Rumaitha, Shanayel and Northeast Bab Tie InU.A.E.Abu DhabiOilOil Field Development350,000,0002018-Q4Construction2022-Q1 ADNOC Onshore - South East Asset - Tie - in Project (A,B, C & D)U.A.E.AsabOilOil Field Development650,000,0002015-Q3Construction2023-Q4 ADNOC Onshore- Replacement of Flowlines & Wellheads Installation - Package 4 U.A.E.Abu DhabiOil, PipelineOil & Gas Field300,000,0002020-Q1On Hold2024-Q1 ADNOC Refining - Ruwais Complex Upgrade - New RefineryU.A.E.RuwaisOil, PetrochemicalsPetrochemical Plant45,000,000,0002021-Q2Pre-FEED2024-Q4 ADNOC Refining - Ruwais LPG RecoveryU.A.E.Abu DhabiOil, RefiningCrude Oil Distillation Unit40,000,0002021-Q1On Hold2023-Q139 PROJECTS oilandgasmiddleeast.com OCTOBER 2020 ProjectCountryCitySectorFacilityBudgetAward DateStatus Completion Date ADNOC Sour Gas - Dalma Field Development - Offshore PackageU.A.E.DalmaOil, OffshoreOil Field Development750,000,0002020-Q4EPC ITB2023-Q1 ADNOC Sour Gas - Dalma Field Development - Onshore PackageU.A.E.DalmaOil, GasOil Field Development1,100,000,0002020-Q4EPC ITB2023-Q1 ADNOC Sour Gas - Dalma Field Development - OverviewU.A.E.DalmaOilOil Field Development2,000,000,0002020-Q4EPC ITB2023-Q1 ADNOC Sour Gas - Hail and Ghasha Megaproject - OverviewU.A.E.Abu DhabiOilOil & Gas Field14,000,000,0002020-Q2Construction2025-Q1 ADNOC Sour Gas - Hail and Ghasha Megaproject - Package 1U.A.E.HailOilOil & Gas Field4,000,000,0002021-Q1EPC ITB2025-Q1 ADNOC Sour Gas - Hail and Ghasha Megaproject - Package 2U.A.E.GhashaOilOil & Gas Field2,000,000,0002021-Q1EPC ITB2025-Q1 ADNOC Sour Gas - Hail and Ghasha Megaproject - Package 3U.A.E.GhashaOilOil & Gas Field2,000,000,0002021-Q1EPC ITB2025-Q1 ADNOC Sour Gas - Hail and Ghasha Megaproject - Package 4U.A.E.GhashaOilOil & Gas Field6,000,000,0002021-Q1EPC ITB2025-Q1 ADNOC Sour Gas - Hail and Ghasha Megaproject - Package 5U.A.E.GhashaOilOil & Gas Field150,000,0002020-Q1Construction2021-Q2 ADOC - Hail Oil Field Water Injection SystemU.A.E.HailOilWater Injection120,000,0002020-Q4FEED2022-Q4 ADPC - Fujairah Port Expansion - Container TerminalU.A.E.FujairahOil, InfrastructureOil Storage Terminal60,000,0002018-Q4Construction2020-Q4 ADPC - Fujairah Port Expansion - OverviewU.A.E.FujairahOil, InfrastructureOil Storage Terminal160,000,0002017-Q3Construction2020-Q4 Al Yasat Petroleum - Belbazem Oil Field DevelopmentU.A.E.Abu DhabiOil, OffshoreOil Field Development1,000,000,0002020-Q4EPC ITB2024-Q1 BAPCO - BAPCO Modernization Program (BMP) - OverviewBahrainSitraOil, RefiningPetroleum Oil Refinery6,000,000,0002018-Q1Construction2023-Q3 BAPCO - BAPCO Modernization Program (BMP) - Residue Conversion Unit BahrainSitraOil, RefiningPetroleum Oil Refinery800,000,0002018-Q1Construction2021-Q3 BAPCO - Offshore Blocks 1,2,3,4 Exploration and ProductionBahrainVariousOil, Gas, OffshoreOil & Gas Field80,000,0002018-Q2 Engineering & Procurement 2022-Q1 BPGIC - Fujairah Oil Terminal - Marine Bunkering (Modular Refinery)U.A.E.FujairahOilRefinery200,000,0002019-Q3 Engineering & Procurement 2021-Q1 BPGIC - Fujairah Oil Terminal - OverviewU.A.E.FujairahOilOil Storage Terminal561,000,0002015-Q2Construction2021-Q1 BPGIC - Fujairah Oil Terminal - Phase 2U.A.E.FujairahOilOil Storage Terminal161,000,0002018-Q3Commissioning2020-Q4 BPGIC - Fujairah Oil Terminal - Phase 3U.A.E.FujairahOilOil Storage Terminal2021-Q1FEED2022-Q2 DRPIC - Duqm Refinery & Petrochemical Complex - Duqm Refinery - Main Process Units OmanDuqmOil, RefiningPetroleum Oil Refinery4,000,000,0002017-Q3Construction2022-Q3 DRPIC - Duqm Refinery & Petrochemical Complex - Duqm Refinery - Offsite Facilities OmanDuqmOil, RefiningPetroleum Oil Refinery800,000,0002017-Q3Construction2022-Q3 DRPIC - Duqm Refinery & Petrochemical Complex - Duqm Refinery - Offsites and Utilities OmanDuqmOil, RefiningPetroleum Oil Refinery2,000,000,0002017-Q3Construction2022-Q3 DRPIC - Duqm Refinery & Petrochemical Complex - Duqm Refinery - Overview OmanDuqmOil, RefiningPetroleum Oil Refinery7,700,000,0002017-Q3Construction2022-Q3 Duqm Petroleum Terminal Company - Duqm Liquid Jetty (IP7)OmanDuqmOilOil Storage Terminal600,000,0002017-Q1Construction2021-Q1 Enerflex - Sadad North Early Development FacilityOmanAl WustaOilOil Field Development200,000,0002018-Q1Construction2021-Q2 ENI - Block 47 Onshore Exploration and ProductionOmanNorthern OmanOilExploration40,000,0002019-Q1 Engineering & Procurement 2023-Q1 Florexx International Investments - Biofuels RefineryOmanSoharOilBiofuels800,000,0002021-Q3On Hold2024-Q3 Fujairah Oil Terminal (FOT) - Fujairah Oil Terminal ModificationsU.A.E.FujairahOil Very Large Crude Carriers (VLCCs) 200,000,0002021-Q1On Hold2024-Q4 GTI Fujairah FZC - Fujairah Oil Storage Terminal - Phase 3U.A.E.FujairahOil, GasOil Storage Tanks100,000,0002020-Q4On Hold2023-Q4 Gulf Petrochem - Fujairah Oil Storage Terminal Facility - Phase 2U.A.E.FujairahOilOil Storage Tanks300,000,0002020-Q4On Hold2025-Q1 Hydrocarbon Finder - Block 7 Onshore Exploration and ProductionOmanAl WustaOilExploration160,000,0002016-Q1Construction2023-Q1 IL&FS Prime Terminals FZC - Fujairah Oil Terminals - Phase 2U.A.E.FujairahOilOil Storage Terminal80,000,0002020-Q4On Hold2022-Q2 KIPIC - Al Zour New Refinery - OverviewKuwaitAl ZourOil, RefiningPetroleum Oil Refinery19,000,000,0002015-Q3Commissioning2020-Q4 KIPIC - Al Zour New Refinery - Package 2 (Support Process Plant)KuwaitAl ZourOil, RefiningPetroleum Oil Refinery3,000,000,0002015-Q3Construction2020-Q4 KIPIC - Al Zour New Refinery - Package 3 (Utilities and Offsites)KuwaitAl ZourOil, RefiningOffsites & Utilities2,100,000,0002015-Q3Construction2020-Q4 KIPIC - Al Zour New Refinery - Package 4 (Tankage)KuwaitAl ZourOil, RefiningOil Storage Tanks1,600,000,0002015-Q3Construction2020-Q4 KIPIC - Al Zour New Refinery - Package 5 (Marine Facilities)KuwaitAl ZourOil, RefiningPetroleum Oil Refinery850,000,0002015-Q3Construction2020-Q4Next >