< Previous30 PROJECTS oilandgasmiddleeast.com SEPTEMBER 2020 PROJECTS ProjectCountryCitySectorFacilityBudgetAward DateStatus Completion Date KGOC - Wafra Central Gas Utilization ProjectKuwaitWafraGasSulphur Recovery1,000,000,000On Hold2021-Q1 KGOC - Wafra Main Gathering CenterKuwaitWafraGasGas Gathering Centre200,000,0002013-Q1On Hold2021-Q1 KIPIC - Al Zour LNG Import And Regasification TerminalKuwaitAl ZourGas Liquefied Natural Gas (LNG) 3,330,000,0002016-Q1Construction2021-Q1 KNPC - Mina Al Ahmadi Refinery Fifth Gas TrainKuwaitMina Al AhmadiGasGas Processing1,500,000,0002015-Q2Construction2021-Q1 KOC - Jurassic Production Facility (JPF) - JPF-4 and JPF-5Kuwait Northern Kuwait Oil, GasOil & Gas Field700,000,0002020-Q4EPC ITB2021-Q2 KOC - New Strategic Gas Export Pipeline From North Kuwait To Mina Al-Ahmadi Refinery Kuwait Northern Kuwait Gas, PipelineGas Pipeline480,000,0002019-Q1 Engineering & Procurement 2021-Q1 KOC - North Kuwait Gathering Center (GC) 32Kuwait Northern Kuwait GasGas Gathering Centre1,650,000,0002017-Q1Construction2020-Q4 KOC - North Kuwait Manifold Gathering System for Gathering Centers (GC) 29, 30, 31 Kuwait Northern Kuwait GasGas Gathering Centre2,500,000,0002014-Q3Construction2020-Q4 KOC - Southeast Kuwait BS-140 & BS-150 UpgradeKuwait Southeast Kuwait GasGas Processing300,000,000FEED2023-Q1 KOC - Southeast Kuwait BS-160 UpgradeKuwait Southeast Kuwait GasGas Processing270,000,0002020-Q4FEED2021-Q1 KOC - Water Management Project - Gathering Centers 3, 4, 7, 21KuwaitSouth KuwaitGasGas Gathering Centre245,000,0002017-Q1Construction2020-Q3 KOC - Water Management Project - Gathering Centers 6, 8, 11, 19Kuwait Southeast Kuwait GasGas Gathering Centre240,000,0002017-Q1Construction2020-Q3 KOC - Water Management Project - Gathering Centers 9, 10, 20, 22KuwaitEast KuwaitGasGas Gathering Centre196,000,0002017-Q1Construction2020-Q3 KOC - Water Management Project - OverviewKuwaitVariousGasGas Gathering Centre681,000,0002017-Q1Construction2020-Q3 KOC - West Kuwait BS-171 Gas Sweetening FacilityKuwaitWest KuwaitGasGas Processing300,000,0002020-Q4FEED2023-Q1 Marsa LNG - Sohar LNG Bunkering Terminal (SLNGB)OmanSoharGas Liquefied Natural Gas (LNG) 90,000,0002020-Q3EPC ITB2022-Q3 Ministry of Oil & Gas - Iran to Oman Subsea Natural Gas PipelineOmanSoharGas, PipelineGas600,000,0002020-Q3EPC ITB2023-Q3 MISA - Unibio - Edhafat - BioProtein FacilitySaudi ArabiaVariousGasGas Processing200,000,0002020-Q1Project Announced2021-Q4 MOG - Block 43b Onshore Exploration and ProductionOmanNorthern OmanOil, GasGas Exploration40,000,0002020-Q1On Hold2023-Q3 NIGC - Jubail GAS Phase 9Saudi ArabiaJubailGas, IndustrialIndustrial Gas Production900,000,0002018-Q3Construction2020-Q3 Oman Gas Company - South Grid Debottlenecking - Phase 2OmanVariousGas, PipelineGas80,000,0002020-Q3EPC ITB2023-Q3 Oman Gas Company - Muscat Gas NetworkOmanMuscatGasGas Network100,000,0002020-Q4On Hold2025-Q4 Oman LNG - LNG Plant UpgradeOmanQalhatGas Liquefied Natural Gas (LNG) 100,000,0002020-Q1 Engineering & Procurement 2022-Q4 OQ - Liwa Plastics Industries Complex - NGL Extraction UnitsOmanSoharGas Natural Gas Liquefaction (NGL) 700,000,0002015-Q4Construction2020-Q3 OQ - Liwa Plastics Industries Complex - NGL PipelineOmanSoharGas, PipelineGas400,000,0002016-Q1Commissioning2020-Q4 OQ - Salalah LPG ExtractionOmanSalalahGas Liquefied Petroleum Gas (LPG) 650,000,0002017-Q1Construction2020-Q3 PDO - Flare Gas to Power SchemesOmanVariousGasGas Recycling200,000,0002020-Q2FEED2022-Q2 PDO - Mabrouk North East Deep Gas Field DevelopmentOmanSaih RawlGasGas Field Development5,000,000,0002020-Q1 Engineering & Procurement 2023-Q1 PDO - Marmul Main Production Station (MMPS) - Gas CompressionOmanMarmulGasGas Compression150,000,0002020-Q4FEED2023-Q3 PDO - Yibal RejuvenationOmanYibalGasGas Production500,000,0002017-Q2Construction2021-Q3 Port of Duqm - Floating Storage Regasification Unit (FSRU)OmanDuqmGasLNG Regassification500,000,0002021-Q1On Hold2024-Q131 PROJECTS oilandgasmiddleeast.com SEPTEMBER 2020 RAK Gas - LPG Storage Terminal - OverviewU.A.E.Ras Al KhaimahGas Liquefied Petroleum Gas (LPG) 300,000,0002020-Q2EPC ITB2022-Q1 SAMREF - Hydrogen Addition Residue Project (SHARP)Saudi ArabiaYanbuGasHydrogenFEED2021-Q1 Saudi Aramco - Yanbu to North Jeddah NGL PipelineSaudi ArabiaYanbuGas, PipelineGas Pipeline600,000,0002016-Q3Construction2021-Q4 Saudi Aramco - Fadhili Gas Plant - OverviewSaudi ArabiaEastern RegionGasGas Treatment Plant6,600,000,0002015-Q3Construction2021-Q1 Saudi Aramco - Gas Storage FacilitiesSaudi ArabiaVariousGasGas Storage Tanks1,000,000,000Project Announced2025-Q4 Saudi Aramco - Haradh Gas Increment Program - Freeflow PipelinesSaudi ArabiaHaradhGas, PipelineFlowlines470,000,0002017-Q4Construction2021-Q3 Saudi Aramco - Haradh Gas Increment Program - North Haradh Field Gas Compression Facilities Saudi ArabiaHaradhGasGas Compression1,200,000,0002017-Q4Construction2021-Q3 Saudi Aramco - Haradh Gas Increment Program - South Haradh Field Gas Compression Facilities Saudi ArabiaHaradhGasGas Compression1,200,000,0002017-Q4Construction2020-Q4 Saudi Aramco - Haradh Gas Increment Program - OverviewSaudi ArabiaHaradhGas, PipelineGas Compression1,200,000,0002017-Q4Construction2021-Q4 Saudi Aramco - Haradh Gas Increment Program - Satellite Gas Compression Facilities Saudi ArabiaHaradhGasGas Compression1,200,000,0002017-Q4Construction2021-Q3 Saudi Aramco - Hawiyah Gas Plant ExpansionSaudi ArabiaHawiyahGasGas Processing1,200,000,0002017-Q4Construction2021-Q2 Saudi Aramco - Hawiyah Unayzah Gas Reservoir StorageSaudi ArabiaHawiyahGasGas Storage Tanks1,700,000,0002020-Q1 Engineering & Procurement 2023-Q4 Saudi Aramco - Juaymah Enhanced LPG Piping NetworkSaudi ArabiaJuaymahGas, PipelineGas100,000,0002019-Q4 Engineering & Procurement 2020-Q4 Saudi Aramco - Liquefied Natural Gas (LNG) Receiving TerminalSaudi ArabiaJeddahGas Liquefied Natural Gas (LNG) 200,000,000Feasibility Study2023-Q1 Saudi Aramco - Marjan Field Expansion - Interlinked Pipeline Installation Saudi ArabiaMarjanOil, Gas, PipelinePipeline600,000,0002019-Q3Construction2022-Q1 Saudi Aramco - Marjan Field Expansion - OverviewSaudi ArabiaMarjanOil, GasOil & Gas Field16,000,000,0002018-Q2Construction2022-Q4 Saudi Aramco - Marjan Field Expansion - Package 10Saudi ArabiaMarjanGasGas Treatment Plant1,200,000,0002019-Q2 Engineering & Procurement 2022-Q2 Saudi Aramco - Marjan Field Expansion - Package 11Saudi ArabiaMarjanGas Natural Gas Liquefaction (NGL) 1,000,000,0002019-Q2 Engineering & Procurement 2022-Q2 Saudi Aramco - Marjan Field Expansion - Package 14Saudi ArabiaMarjanGasSulphur Recovery100,000,0002019-Q4 Engineering & Procurement 2022-Q2 Saudi Aramco - Marjan Field Expansion - Package 4Saudi ArabiaMarjanGas, OffshoreGas Field Development1,500,000,0002019-Q1Construction2022-Q4 Saudi Aramco - Marjan Field Expansion - Package 6Saudi ArabiaMarjanOil, GasGas Compression1,500,000,0002019-Q2Construction2023-Q4 Saudi Aramco - Marjan Field Expansion - Package 9Saudi ArabiaMarjanGasGas Compression1,000,000,0002019-Q2 Engineering & Procurement 2022-Q2 Saudi Aramco - Marjan, Berri, Zuluf and Safaniyah Expansion - Overview Saudi ArabiaEastern RegionOil, Gas, OffshoreOil & Gas Field7,000,000,0002016-Q4Construction2023-Q2 Saudi Aramco - Master Gas System Expansion (MGSE) - OverviewSaudi ArabiaVariousGas, PipelineNon Associated Gas4,050,000,0002014-Q3Construction2020-Q4 Saudi Aramco - Master Gas System Expansion (MGSE) - Phase 2 - Package 1 - Western Region Pipeline Saudi ArabiaWestern RegionGas, PipelineGas830,000,0002016-Q1Construction2020-Q4 Saudi Aramco - Master Gas System Expansion (MGSE) - Phase 2 - Package 2 - Central Region Pipeline Saudi ArabiaCentral RegionGas, PipelineGas367,000,0002016-Q1Construction2020-Q4 Saudi Aramco - Master Gas System Expansion (MGSE) - Phase 2 - Package 3 - Eastern Region Pipeline Saudi ArabiaEastern RegionGas, PipelineGas374,000,0002016-Q1Construction2020-Q4 Saudi Aramco - Multiple Pipelines RevampSaudi ArabiaEastern RegionGas, PipelineGas250,000,0002016-Q4Construction2020-Q4 Saudi Aramco - Storage TanksSaudi ArabiaVarious Oil, Gas, Infrastructure Bulk Storage250,000,0002020-Q2 Engineering & Procurement 2022-Q4 Saudi Aramco - Storage Tanks and Associated EquipmentSaudi ArabiaYanbuGasGas Storage Tanks400,000,0002017-Q1Construction2020-Q4 ProjectCountryCitySectorFacilityBudgetAward DateStatus Completion Date32 PROJECTS oilandgasmiddleeast.com SEPTEMBER 2020 GCC OIL – AUGUST 2020 ProjectCountryCitySectorFacilityBudget Award Date Status Completion Date ADNOC - EMARAT - Fujairah Terminal Expansion Phase 3U.A.E.FujairahOilOil Storage Terminal40,000,0002021-Q1On Hold2024-Q4 ADNOC - Al Dhafra Petroleum - Haliba Oil Field - OverviewU.A.E.HalibaOilOil Field Development1,350,000,0002018-Q1Construction2023-Q4 ADNOC - Al Dhafra Petroleum - Haliba Oil Field - Phase 1U.A.E.HalibaOilOil Field Development500,000,0002018-Q1Commissioning2020-Q4 ADNOC - Al Dhafra Petroleum - Haliba Oil Field - Phase 2U.A.E.HalibaOilOil Field Development800,000,0002020-Q4FEED2023-Q4 ADNOC - Al Dhafra Petroleum - Haliba Tie - in WellsU.A.E.HalibaOilOil Field Development130,000,0002020-Q2 Engineering & Procurement 2024-Q2 ADNOC - Fujairah - Midstream/ Downstream FacilityU.A.E.FujairahOilOil & Gas Field2021-Q4Project Announced2025-Q4 ADNOC - Fujairah Mandous FieldU.A.E.MandousOilOil Storage Tanks2,200,000,0002017-Q4Construction2023-Q4 ADNOC - Replacement of Flowlines & Wellheads Installation - Overview U.A.E.Abu DhabiOil, PipelineOil & Gas Field1,500,000,0002020-Q1 Engineering & Procurement 2024-Q1 ADNOC - Replacement of Flowlines & Wellheads Installation - Package 1 U.A.E.Abu DhabiOil, PipelineOil & Gas Field300,000,0002020-Q1 Engineering & Procurement 2024-Q1 ADNOC - Replacement of Flowlines & Wellheads Installation - Package 2 U.A.E.Abu DhabiOil, PipelineOil & Gas Field400,000,0002020-Q1 Engineering & Procurement 2024-Q1 ADNOC - Replacement of Flowlines & Wellheads Installation - Package 3 U.A.E.Abu DhabiOil, PipelineOil & Gas Field300,000,0002020-Q1 Engineering & Procurement 2024-Q1 ADNOC - Replacement of Flowlines & Wellheads Installation - Package 4 U.A.E.Abu DhabiOil, PipelineOil & Gas Field300,000,0002020-Q1 Engineering & Procurement 2024-Q1 ADNOC - Umm Shaif Long Term Development - Phase 1U.A.E.Umm ShaifOil, OffshoreOil Field Development400,000,0002020-Q4EPC ITB2023-Q1 ADNOC Offshore - Umm Al Dalkh Field DevelopmentU.A.E.Abu DhabiOilOil Field Development100,000,0002020-Q4EPC ITB2022-Q4 ADNOC Offshore - Umm Shaif & Zakum - Application of DOF on Brownfield Towers U.A.E.Abu DhabiOil, OffshoreOil Field Development120,000,0002020-Q1 Engineering & Procurement 2023-Q2 ADNOC Offshore - Umm Shaif Infield Pipelines ReplacementU.A.E.Abu DhabiOil, PipelineOil Field Development500,000,0002020-Q4On Hold2021-Q4 ADNOC Offshore - Zirku Facilities Capacity EnhancementU.A.E.ZirkuOilOil Field Development410,000,0002018-Q1Construction2021-Q2 ADNOC Onshore - 1.8MBPD Development - Bab Artificial Lift WellsU.A.E.Abu DhabiOilArtificial Lift100,000,0002020-Q2EPC ITB2021-Q3 ADNOC Onshore - Al Dabb'iya Thamama B Transition Zone B - Phase 2U.A.E.ThamamaOilOil Field Development200,000,0002020-Q4EPC ITB2023-Q4 ADNOC Onshore - Asab Full Field Development II - OverviewU.A.E.AsabOilOil Field Development450,000,0002019-Q1Construction2022-Q1 ADNOC Onshore - Asab Full Field Development II - Stage 1U.A.E.AsabOilOil Field Development100,000,0002019-Q1Construction2021-Q4 ADNOC Onshore - Asab Full Field Development II - Stage 2U.A.E.AsabOilOil Field Development350,000,0002020-Q4EPC ITB2022-Q4 ADNOC Onshore - Bab 485 MBD Sustainable FacilitiesU.A.E.BabOilArtificial Lift500,000,0002019-Q4 Engineering & Procurement 2021-Q2 ADNOC Onshore - Bab Integrated Facilities ProjectU.A.E.BabOilOil Field Development3,000,000,0002017-Q4Commissioning2020-Q4 ADNOC Onshore - Bab Process Control and Power System UpgradeU.A.E.BabOilWater Injection300,000,0002019-Q1Construction2021-Q3 ADNOC Onshore - Bab TH - F Peripheral DevelopmentU.A.E.Abu DhabiOil, GasNitrogen400,000,0002020-Q4On Hold2022-Q2 ADNOC Onshore - Bu Hasa Tie - in Wells (Call-Off)U.A.E.Bu HasaOilOil Field Development200,000,0002020-Q3EPC ITB2025-Q1 ADNOC Onshore - Buhasa Integrated Facilities ProjectU.A.E.Bu HasaOilOil Production3,000,000,0002018-Q4Construction2024-Q1 ADNOC Onshore - Buhasa Wellhead Remote MonitoringU.A.E.Abu DhabiOilOil Field Development100,000,0002019-Q1Construction2022-Q1 ADNOC Onshore - Fujairah MOT - Hydraulic Pressure Recovery System Turbine U.A.E.FujairahOilOil Field Development800,000,0002020-Q4On Hold2023-Q1 ADNOC Onshore - Jebel Dhanna Replacement of Main Oil Lines (MOL) 1.2 & 3.5 U.A.E.Jebel DhannaOilPipeline225,000,0002020-Q3EPC ITB2023-Q3 ADNOC Onshore - Qusahwira Field Development - Phase 2U.A.E.Abu DhabiOilOil Field Development600,000,0002019-Q2Construction2023-Q3 ADNOC Onshore - Rumaitha, Shanayel and Northeast Bab Tie InU.A.E.Abu DhabiOilOil Field Development350,000,0002018-Q4Construction2022-Q1 ADNOC Onshore - South East Asset - Tie - in Project (A,B, C & D)U.A.E.AsabOilOil Field Development650,000,0002015-Q3Construction2023-Q4 ADNOC Refining - Ruwais Complex Upgrade - New RefineryU.A.E.RuwaisOil, PetrochemicalsPetrochemical Plant45,000,000,0002021-Q2Pre-FEED2024-Q433 PROJECTS oilandgasmiddleeast.com SEPTEMBER 2020 ProjectCountryCitySectorFacilityBudgetAward DateStatus Completion Date ADNOC Refining - Ruwais LPG RecoveryU.A.E.Abu DhabiOil, RefiningCrude Oil Distillation Unit40,000,0002021-Q1On Hold2023-Q1 ADNOC Sour Gas - Dalma Field Development - Offshore PackageU.A.E.DalmaOil, OffshoreOil Field Development750,000,0002020-Q4EPC ITB2023-Q1 ADNOC Sour Gas - Dalma Field Development - Onshore PackageU.A.E.DalmaOil, GasOil Field Development1,100,000,0002020-Q4EPC ITB2023-Q1 ADNOC Sour Gas - Dalma Field Development - OverviewU.A.E.DalmaOilOil Field Development2,000,000,0002020-Q4EPC ITB2023-Q1 ADNOC Sour Gas - Hail and Ghasha Megaproject - OverviewU.A.E.Abu DhabiOilOil & Gas Field14,000,000,0002020-Q2 Engineering & Procurement 2025-Q1 ADNOC Sour Gas - Hail and Ghasha Megaproject - Package 1U.A.E.HailOilOil & Gas Field4,000,000,0002021-Q1EPC ITB2025-Q1 ADNOC Sour Gas - Hail and Ghasha Megaproject - Package 2U.A.E.GhashaOilOil & Gas Field2,000,000,0002021-Q1EPC ITB2025-Q1 ADNOC Sour Gas - Hail and Ghasha Megaproject - Package 3U.A.E.GhashaOilOil & Gas Field2,000,000,0002021-Q1EPC ITB2025-Q1 ADNOC Sour Gas - Hail and Ghasha Megaproject - Package 4U.A.E.GhashaOilOil & Gas Field6,000,000,0002021-Q1EPC ITB2025-Q1 ADNOC Sour Gas - Hail and Ghasha Megaproject - Package 5U.A.E.GhashaOilOil & Gas Field150,000,0002020-Q1 Engineering & Procurement 2021-Q2 ADOC - Hail Oil Field - Water Injection SystemU.A.E.HailOilWater Injection200,000,0002020-Q2FEED2021-Q3 ADPC - Fujairah Port Expansion - Container TerminalU.A.E.FujairahOil, InfrastructureOil Storage Terminal60,000,0002018-Q4Construction2020-Q4 ADPC - Fujairah Port Expansion - OverviewU.A.E.FujairahOil, InfrastructureOil Storage Terminal160,000,0002017-Q3Construction2020-Q4 Al Yasat Petroleum - Belbazem Oil Field DevelopmentU.A.E.Abu DhabiOil, OffshoreOil Field Development1,000,000,0002020-Q3EPC ITB2024-Q1 BAPCO - BAPCO Modernization Program (BMP) - OverviewBahrainSitraOil, RefiningPetroleum Oil Refinery6,000,000,0002018-Q1Construction2023-Q3 BAPCO - BAPCO Modernization Program (BMP) - Residue Conversion Unit BahrainSitraOil, RefiningPetroleum Oil Refinery800,000,0002018-Q1Construction2021-Q3 BAPCO - Offshore Blocks Exploration and ProductionBahrainVariousOil, Gas, OffshoreOil & Gas Field80,000,0002018-Q2 Engineering & Procurement 2022-Q1 BPGIC - Fujairah Oil Terminal - Marine Bunkering (Modular Refinery)U.A.E.FujairahOilRefinery200,000,0002019-Q3 Engineering & Procurement 2021-Q1 BPGIC - Fujairah Oil Terminal - OverviewU.A.E.FujairahOilOil Storage Terminal561,000,0002015-Q2Construction2021-Q1 BPGIC - Fujairah Oil Terminal - Phase 2U.A.E.FujairahOilOil Storage Terminal161,000,0002018-Q3Commissioning2020-Q4 BPGIC - Fujairah Oil Terminal - Phase 3U.A.E.FujairahOilOil Storage Terminal2021-Q1FEED2022-Q2 DRPIC - Duqm Refinery & Petrochemical Complex - Duqm Refinery - Main Process Units OmanDuqmOil, RefiningPetroleum Oil Refinery4,000,000,0002017-Q3Construction2022-Q3 DRPIC - Duqm Refinery & Petrochemical Complex - Duqm Refinery - Offsites and Utilities OmanDuqmOil, RefiningPetroleum Oil Refinery2,000,000,0002017-Q3Construction2022-Q3 DRPIC - Duqm Refinery & Petrochemical Complex - Duqm Refinery - Overview OmanDuqmOil, RefiningPetroleum Oil Refinery7,700,000,0002017-Q3Construction2022-Q3 DRPIC - Duqm Refinery & Petrochemical Complex - Duqm Refinery - Package 3 OmanDuqmOil, RefiningPetroleum Oil Refinery800,000,0002017-Q3Construction2022-Q3 Duqm Petroleum Terminal Company - Duqm Liquid Jetty (IP7)OmanDuqmOilOil Storage Terminal600,000,0002017-Q1Construction2021-Q1 Enerflex - Sadad North Early Development FacilityOmanAl WustaOilOil Field Development200,000,0002018-Q1Construction2021-Q2 ENI - Block 47 Onshore Exploration and ProductionOmanNorthern OmanOilExploration40,000,0002019-Q1 Engineering & Procurement 2023-Q1 Florexx International Investments - Biofuels RefineryOmanSoharOilBiofuels800,000,0002021-Q3On Hold2024-Q3 Fujairah Oil Terminal (FOT) - Fujairah Oil Terminal ModificationsU.A.E.FujairahOil Very Large Crude Carriers (VLCCs) 200,000,0002021-Q1On Hold2024-Q4 GTI Fujairah FZC - Fujairah Oil Storage Terminal - Phase 3U.A.E.FujairahOil, GasOil Storage Tanks100,000,0002020-Q4On Hold2023-Q4 Gulf Petrochem - Fujairah Oil Storage Terminal Facility - Phase 2U.A.E.FujairahOilOil Storage Tanks300,000,0002020-Q4On Hold2025-Q1 Hydrocarbon Finder - Block 7 Onshore Exploration and ProductionOmanAl WustaOilExploration160,000,0002016-Q1Construction2023-Q1 IL&FS Prime Terminals FZC - Fujairah Oil Terminals - Phase 2U.A.E.FujairahOilOil Storage Terminal80,000,0002020-Q4On Hold2022-Q2 KIPIC - Al Zour New Refinery - OverviewKuwaitAl ZourOil, RefiningPetroleum Oil Refinery19,000,000,0002015-Q3Construction2020-Q4 KIPIC - Al Zour New Refinery - Package 2 (Support Process Plant)KuwaitAl ZourOil, RefiningPetroleum Oil Refinery3,000,000,0002015-Q3Construction2020-Q434 PROJECTS oilandgasmiddleeast.com SEPTEMBER 2020 KIPIC - Al Zour New Refinery - Package 3 (Utilities and Offsites)KuwaitAl ZourOil, RefiningOffsites & Utilities2,100,000,0002015-Q3Construction2020-Q4 KIPIC - Al Zour New Refinery - Package 4 (Tankage)KuwaitAl ZourOil, RefiningOil Storage Tanks1,600,000,0002015-Q3Construction2020-Q4 KIPIC - Al Zour New Refinery - Package 5 (Marine Facilities)KuwaitAl ZourOil, RefiningPetroleum Oil Refinery850,000,0002015-Q3Construction2020-Q4 KNPC - Clean Fuels Project - Mina Abdulla Refinery - Package 1KuwaitMina AbdullahOil, RefiningPetroleum Oil Refinery4,000,000,0002014-Q1Commissioning2020-Q3 KNPC - Clean Fuels Project - Mina Abdulla Refinery - Package 2KuwaitMina AbdullahOil, RefiningPetroleum Oil Refinery4,000,000,0002014-Q1Commissioning2020-Q3 KNPC - Clean Fuels Project - Package 1 - Mina Abdulla Refinery Units 111, 112, 113 and 216 KuwaitMina AbdullahOil, RefiningPetroleum Oil Refinery550,000,0002015-Q3Commissioning2020-Q3 KNPC - Kuwait Clean Fuels Project - OverviewKuwaitVariousOil, RefiningPetroleum Oil Refinery13,800,000,0002014-Q1Commissioning2021-Q1 KNPC - Mina Abdulla Debottlenecking of Coke Unit 20KuwaitMina AbdullahOil, RefiningPetroleum Oil Refinery100,000,0002017-Q4Construction2021-Q1 KNPC - New Local Marketing Depot At Matlaa AreaKuwait Northern Kuwait OilOil Storage Tanks1,320,000,0002020-Q3FEED2022-Q1 KOC - Al Zour New Refinery Crude Oil PipelinesKuwaitAhmadiOil, PipelinePipeline845,000,0002017-Q3Construction2021-Q3 KOC - Installation Of New Desalter Train At GC-9, GC-10, GC-19 & GS-21 KuwaitVariousOil, RefiningCrude Oil Distillation Unit250,000,0002018-Q4Construction2022-Q2 KOC - Jurassic Production Facilities Off-Plot WorksKuwait Northern Kuwait OilOil Field Development254,000,0002016-Q4Construction2022-Q2 KOC - Jurassic Production Facility (JPF) - JPF-4 and JPF-5Kuwait Northern Kuwait Oil, GasOil & Gas Field700,000,0002020-Q4EPC ITB2021-Q2 KOC - Kuwait Bay ExplorationKuwaitVariousOil, OffshoreExploration904,500,0002014-Q1 Engineering & Procurement 2023-Q1 KOC - New 48'' Crude Transit Line From North Kuwait To CMM (TL-5)Kuwait Northern Kuwait Oil, PipelinePipeline395,000,0002017-Q3Construction2020-Q4 KOC - Wara Pressure Maintenance Project - Train 3Kuwait Southeast Kuwait OilOil Field Development500,000,0002017-Q2Construction2020-Q4 Masirah Oil Ltd - Block 50 (Masirah Bay Offshore) - ExplorationOmanMasirah BasinOilExploration250,000,0002011-Q1Construction2025-Q1 Medco Arabia - Block 56 Onshore Exploration and ProductionOmanAl WustaOilExploration50,000,0002014-Q4 Engineering & Procurement 2020-Q4 MOG - Block 43b Onshore Exploration and ProductionOmanNorthern OmanOil, GasGas Exploration40,000,0002020-Q1On Hold2023-Q3 Oman Lasso Exploration and Production Karwan - Block 54 Onshore Exploration and Production OmanAl WustaOilExploration50,000,0002015-Q3 Engineering & Procurement 2020-Q3 OQ - Block 48 Onshore Exploration and Production (Malih Block)OmanAl DahirahOilExploration30,000,0002017-Q1 Engineering & Procurement 2021-Q1 OQ - Block 60 Concession - Bisat Oilfield Development - Early Production Facility - Station C OmanCentral OmanOilOil Field Development400,000,0002020-Q4EPC ITB2022-Q4 OQ - Block 60 Concession - Bisat Oilfield Development - Full Field Development OmanCentral OmanOilOil Field Development150,000,0002020-Q3EPC ITB2023-Q3 OQ - Block 60 Concession Development - OverviewOmanCentral OmanOilOil & Gas Field1,100,000,0002019-Q1Construction2030-Q4 OQ - Oil Storage and TerminalOmanDuqmOilOil Storage Terminal200,000,0002021-Q3Project Announced2024-Q3 OTTCO - Main Line Oil - Ras Markaz Crude Oil Terminal PipelineOmanDuqmOil, PipelineOil300,000,0002020-Q1FEED2022-Q4 OTTCO - Ras Markaz Crude Oil ParkOmanDuqmOilOil Storage Terminal400,000,0002018-Q3 Engineering & Procurement 2021-Q4 PDO - Marmul Main Production Station (MMPS) - Tanks and HeatersOmanMarmulOilOil Storage Tanks70,000,0002020-Q4FEED2022-Q4 PDO - Marmul Polymer Phase 3 (MPP3) - Off-Plot and On-Plot Production Facilities OmanMarmulOilOil Field Development270,000,0002018-Q1 Engineering & Procurement 2021-Q1 PDO - Yibal Khuff Sudair Field DevelopmentOmanNorthern OmanOilOil Field Development3,000,000,0002015-Q2Construction2021-Q3 Petro Rabigh - Bottom of the Barrel ProjectSaudi ArabiaAbhaOilOil Production3,500,000,000On Hold2021-Q4 Petroleb SAL - Block 57 Onshore Exploration and ProductionOmanDhofarOilExploration3,000,0002018-Q1 Engineering & Procurement 2022-Q1 Port of Fujairah - Dibba PortU.A.E.FujairahOil, InfrastructureOil Storage Terminal100,000,0002020-Q1EPC ITB2021-Q4 Sabic - Saudi Aramco - Yanbu Crude Oil To Chemicals (COTC) ComplexSaudi ArabiaYanbuOil, PetrochemicalsPetrochemical Plant20,000,000,000FEED2025-Q4 Saudi Aramco - Abqaiq Oil Plant RevampSaudi ArabiaAbqaiqOilOil Production1,000,000,0002021-Q4Pre-FEED2023-Q1 Note : The above information is the sole property of DMS Projects. Budget figures are shown as US $ values. Source: dmsprojects.net ProjectCountryCitySectorFacilityBudgetAward DateStatus Completion DateExperience the Progress. Mobile cranes from Liebherr Top capacities in all lifting classes Long telescopic booms with variable working equipment High mobility and short assembly times Comprehensive comfort and safety features Worldwide customer support by manufacturer Liebherr-Werk Ehingen GmbH P.O. Box 1361 89582 Ehingen/Do., Germany Phone: +49 7391 502 0 E-mail: info.lwe@liebherr.com www.facebook.com/LiebherrConstruction www.liebherr.com 2008-501_102 LWE_041_LTM_1650-8-1_OilGasME_GB.indd 12008-501_102 LWE_041_LTM_1650-8-1_OilGasME_GB.indd 115.07.20 16:3815.07.20 16:38Next >